Hyderabad Metro Rail – Route Map, Timings, Fare 2023 [Latest Data]

The Hyderabad Metro is a mass rapid transit system constructed to serve Telangana, Hyderabad’s capital. Phase 1 of the project, which spans 72 km, was initiated in April 2012 on a Public-Private Partnership (PPP) model by L&T Metro Rail Hyderabad Limited (LTMRHL) and was completed in February 2020 with the opening of the entire Green Line. However, the 5 km MGBS – Falaknuma section of the Green Line could not be built due to local protests in the Old City, resulting in Phase 1 being reduced to 67 km.

Hyderabad Metro Rail

Phase 2 of the Hyderabad Metro, which covers a distance of 63 km, is currently in the proposal stage. The Detailed Project Report (DPR) was submitted for approval to the Telangana government in February 2020, and the routes may be subject to modifications before construction commences in 2023.

Hyderabad Metro Rail Route Map:

The Hyderabad metro route is a convenient transportation option that covers a significant portion of the city, making travel easy for passengers. With the increasing population in India, especially in cities like Hyderabad, the need for a metro system has become apparent. The Multi-Modal Transport System (MMTS) was introduced in 2003 to provide commuter train services between Hyderabad and Secunderabad.

However, the demand for an urban metro system has increased due to system flaws and wear and tear over time. The Hyderabad Metro was planned in 2003 and was initially expected to be completed by 2015. However, test trains began running in 2014, and the first phase opened to the public in November 2017.

The Hyderabad Metro Rail (HMR) is a Mass Rapid Transit System (MRTS) that covers the entire city of Hyderabad, and its construction was completed in December 2017. The HMR spans 72 kilometers and has three elevated corridors with standard gauge tracks, 64 stops, and three depots.

Hyderabad Metro Rail Lines:

The Hyderabad Metro Rail services cover the entire city and include three interchange stations that connect three separate lines: the Red Line, Green Line, and Blue Line.

  • Red Line – Miyapur to LB Nagar via MG Bus Station, Nampally, and Ameerpet
  • Green Line – JBS Parade Ground to MG Bus Station via Secunderabad
  • Blue Line – Nagole to Raidurg via Secunderabad & Ameerpet

The Red Line runs from northwest to southeast through the city’s central area, covering a distance of 29 kilometers and passing through 27 stations from Miyapur to LB Nagar. The train comprises three carriages, travels at a top speed of 80 km/h, and stops every 4 to 10 minutes.

The Green Line, operated by Hyderabad Metro Rail (HMR), consists of 9 stops and covers the route from JBS Parade Ground to MG Bus Station via Secunderabad. It became fully operational for passengers at the end of 2019 and was planned in two stages: a 9.66 km route from JBS to MGBS and a 5.36 km route from MGBS to Falaknuma.

The Blue Line, also operated by Hyderabad Metro Rail, covers a distance of 23 stops from Raidurg to Secunderabad, east of all active Hyderabad metro stations. Each train has three carriages and can travel at a maximum speed of 80 km/h, with a 5 to 10 minutes headway between trains.

Hyderabad Metro Route-[Red Line]:

The Red Line, part of the Hyderabad Metro Rail system, is a rapid transit line that runs from Miyapur to LB Nagar and covers a distance of 29.21 kilometers. Hyderabad Metro Rail operates this line and serves 27 stations along the route. Additionally, the Red Line has two interchange stations connecting to other Hyderabad Metro lines. The stations along the Red Line are as follows:

  1. Miyapur
  2. JNTU College
  3. KPHB Colony
  4. Kukatpally
  5. Balanagar
  6. Moosapet
  7. Bharatnagar
  8. Erragadda
  9. ESI Hospital
  10. SR Nagar
  11. Ameerpet
  12. Punjagutta
  13. Errum Manzil
  14. Khairatabad
  15. Lakdi Ka Pul
  16. Assembly
  17. Nampally
  18. Gandhi Bhavan
  19. Osmania Medical College
  20. MG Bus Station
  21. Malakpet
  22. New Market
  23. Musarambagh
  24. Dilsukhnagar
  25. Chaitanyapuri
  26. Victoria Memorial
  27. LB Nagar

Hyderabad Metro Route-[Blue Line]:

The Blue Line is one of the metro rail lines in Hyderabad, operated by Hyderabad Metro Rail, which serves all active metro stations in Hyderabad. The Blue Line covers a distance of 27 kilometers and has 23 stations that run from Nagole to Raidurg. The line has two interchange stations that allow passengers to transfer to other lines of the Hyderabad Metro. The stations along the Blue Line are as follows:

  1. Nagole
  2. Uppal
  3. Survey of India
  4. NGRI
  5. Habsiguda
  6. Tarnaka
  7. Mettuguda
  8. Secunderabad East
  9. Parade Ground
  10. Paradise
  11. Rasoolpura
  12. Prakash Nagar
  13. Begumpet
  14. Ameerpet
  15. Madhura Nagar
  16. Yusufguda
  17. Road No. 5 Jubilee Hills
  18. Jubilee Hills Check Post
  19. Peddamma Temple
  20. Madhapur
  21. Durgam Cheruvu
  22. HITEC City
  23. Raidurg

Hyderabad Metro Route- [Green line]:

The Green Line is a metro rail line in Hyderabad that runs from JBS Parade Ground to MG Bus Station. It is operated by Hyderabad Metro Rail and covers a distance of 16.6 km, with 15 stations along the route. The Green Line is a public-private collaboration sponsored by the Hyderabad Metro Red Line. Additionally, two interchange stations on the Hyderabad Metro’s Green Line allow passengers to transfer to other lines. The stations along the Green Line are:

  1. JBS Parade Ground
  2. Gandhi Hospital
  3. Musheerabad
  4. RTC Cross Roads
  5. Chikkadpally
  6. Narayanguda
  7. Sultan Bazaar
  8. MG Bus Station
  9. Salarjung Museum
  10. Charminar
  11. Shalibanda
  12. Shamshergunj
  13. Jungametta
  14. Falaknuma
  15. TSRTC Bus Station (Malakpet)

Hyderabad Metro Route Map (Operational):

Hyderabad Metro Future Network Route Map: Phase 1 & 2:

Key: Phase 1 (Operational) | Phase 2 (Planned):

Hyderabad Metro Lines (Interchange Stations):

The Hyderabad Metro has three interchange stations that allow passengers to transfer between different metro lines. The three interchange stations on the Hyderabad Metro route are:

  1. Ameerpet Metro Train Interchange Station: This station is an interchange between the Red Line and the Blue Line. Passengers can easily transfer between these two lines at Ameerpet Station.
  2. Parade Grounds Metro Train Interchange Station: This station is an interchange between the Green and Blue lines. Passengers can transfer between these two lines at Parade Grounds Station.
  3. MGBS Metro Train Interchange Station: This station is an interchange between the Red Line and the Green Line. Passengers can easily transfer between these two lines at MGBS Station.

Hyderabad Metro Rail – Timings:

The Hyderabad Metro Rail operates from 6 AM to 11:15 PM, with the first train departing at 6 AM and the last leaving at 10:15 PM and reaching the final stop at 11:15 PM.

During peak hours, trains run every 7 minutes, while during non-peak hours, they run every 8 minutes.

  • The Red Line takes 52 minutes to travel the 28-km route between Miyapur and L.B. Nagar, while the Blue Line takes 53 minutes to travel the 26.8-km route from Nagole to Raidurg. The Green Line takes 16 minutes to travel the 7.7-km route from JBS Parade Ground to Sultan Bazar.
  • Travel time from Miyapur to L.B. Nagar on the Red Line takes 3 minutes to JNTU College, 19 minutes to ES Hospital Metro Station, and 52 minutes to L.B. Nagar.
  • Meanwhile, on the Blue Line, travel time from Nagole to the Stadium Metro Station takes 4 minutes, Ameerpet Metro Station takes 29 minutes, and Raidurg Metro Station takes 53 minutes.
  • If you ride on the Green Line from JBS Parade Ground Metro Station, you can reach Secunderabad West in 2 minutes, RTC Cross Roads Metro Station in 10 minutes, and Sultan Bazaar in 16 minutes.

Hyderabad Metro Rail Fare 2023:

The fares for using the Hyderabad Metro map/route depend on the ticket type and the distance traveled. Two types of tickets are available- tokens for single journeys and smart cards for multiple journeys, both priced at INR 20 with seasonal savings of up to 10%. The smart card can be recharged for multiples of INR 50 and must maintain a minimum balance of INR 10.

The minimum fare for all three lines, i.e. Red Line, Blue Line, and Green Line, is INR 10. The maximum fare for the Red and Blue Lines is INR 60, while for the Green Line, it is INR 35.

For example, if you start your journey from Miyapur on the Red Line, you will have to pay INR 15 to reach JNTU College, INR 40 to reach ES Hospital Metro Station, and INR 60 to reach L.B. Nagar.

Similarly, if you board a train from Nagole on the Blue Line, you can travel to Stadium Metro Station for INR 15, Ameerpet Metro Station for INR 45, and Raidurg Metro Station for INR 60.

Finally, if you catch a metro from JBS Parade Ground Metro Station on the Green Line, you can travel to Secunderabad West for INR 10, RTC Cross Roads Metro Station for INR 15, and MG Bus Station 3 for INR 35.

Hyderabad Metro Tickets:

The Hyderabad Metro Rail offers two options for passengers to board the metro: Contactless Smart Card (CSC) and Contactless Smart Token (CST). Non-contact Tokens are available for one-way or return trips and are more suitable for non-frequent riders.

On the other hand, Contactless Smart Cards act as stored value cards, which can be monetary or non-monetary, or a combination of both. These cards have various features that attract regular and frequent users, and the fare between two stations is deducted from the stored value at the departure gate.

Hyderabad Metro Automatic Fare Collection:

The Hyderabad Metro Rail has an Automated Fare Collection System that utilizes No-contact Fare Media Technology. This system includes automatic entry and exit gates and fences to divide the paid and unpaid areas of metro stations. This ensures that only passengers with valid tickets can enter the system by checking their tickets at the entry and departure points.

How To Check Balance On Hyderabad Metro Card?

To check the balance of your Hyderabad Metro Rail Smart Card online, you first need to register on the official portal and obtain a login ID and password. Once logged in, enter your Metro Smart Card number to generate your balance and see its validity.

How To Recharge Hyderabad Metro Rail Smart Card Online?

  • You can download the Hyderabad Metro Rail Smart Card application from the Google Play Store to recharge your HMRC Metro Smart Card. The application is available only for Android users, but iPhone users can expect it soon.
  • After installation, select the online recharge option and enter the 8-digit number available on the back of your Metro Smart Card.
  • Enter the recharge amount and select your preferred payment mode, either debit or credit card.
  • You will also be required to fill in your details such as name, address, email ID, phone number, and Aadhaar card.
  • Once you have completed your details, enter your Hyderabad Metro Rail Smart Card details, and your transaction will be completed.

Hyderabad Metro Station Facilities:

Hyderabad Metro is the pioneer of “in-flight” entertainment for train passengers in the country, enabling them to watch movies, download games, and listen to music by clicking a button. Additionally, charging points are available in the metro for charging electronic devices. The metro stations are equipped with facilities like elevators, stairs, and provisions for the disabled.

The station has automated ticket vending machines, an automatic fare collection system, and easy access. Toilets and telephones are some of the primary amenities provided at the stations.

Hyderabad Metro Phase 1, 2 :

Hyderabad Metro Phase 1:

The construction work on Hyderabad Metro’s Phase 1 project began in April 2012, following the Public-Private Partnership (PPP) model, by Larsen and Toubro Metro Rail Hyderabad Ltd (LTMRHL). The first section, Miyapur-Ameerpet-Nagole, started its operations in November 2017, and the last section, JBS-MGBS, was opened on February 7, 2020.

Phase 1 involved the construction of three new lines, all of which run on standard gauge tracks. The Red Line, or Line 1, which is 29.87 km long, is elevated and has 27 stations. It starts at Miyapur and ends at L B Nagar.

The Green Line or Line 2 is 9.6 km long, elevated, and has nine stations. It runs from JBS Parade Ground to MGBS and has a depot at Nagole. The Blue Line or Line 3 is 28 km long, elevated, and has 23 stations. It starts at Nagole and ends at Raidurg, with a depot at Nagole.

Hyderabad Metro Phase 2:

The proposed Phase 2 of the Hyderabad Metro project, which includes an Airport Express Line, is currently in the proposal stage and its detailed project report was submitted to the Telangana government for approval in February 2020. The project is expected to cover a total distance of 63 km and will include 4 elevated corridors, with 1 new line and 3 extensions of existing lines built in Phase 1.

The project’s estimated cost is Rs. 6,250 crores and will be executed by Hyderabad Airport Metro Limited (HAML). The execution method, whether EPC or PPP, has yet to be finalized. The foundation stone for the Airport Express Line was laid on December 9, 2022, by the Chief Minister of Telangana.

Hyderabad Metro Customer Care (Helpline) Number:

If you have any queries or need further information about the Hyderabad metro, you can reach out to the following address, phone number, or email:

  • Office Address: Hyderabad Metro Rail Depot, Uppal Main Road, Uppal, Hyderabad – 500039.
  • Phone number: +91 4023332555
  • Email address: customerservice@ltmetro.com

Frequently Asked Questions:

Timing of Metro Rail running in Hyderabad?

Hyderabad Metro Rail is operational the time between 06:00 am to 11:00 pm.

What is the ticket price of the Metro train in Hyderabad?

The Minimum Fare or Ticket Price for Hyderabad Metro Rail Ticket is Rs 10/- and the Maximum Fare or Ticket Price for Hyderabad Metro Rail Ticket is Rs 60/-.

Conclusion:

In conclusion, Hyderabad Metro Rail is one of the largest elevated Metro Rail systems globally and has significantly improved the lives of people in Hyderabad. It has not only provided affordable transportation but has also positively impacted the city’s infrastructure.

With the construction of additional Metro Lines underway, it will be fascinating to observe how it transforms the real estate landscape in Hyderabad.