The Jaipur Metro is a modern and efficient transportation system in Jaipur, also known as the Pink City. It consists of two phases; the first is already operational and is being extended. Like other metro systems in India, it uses standard gauge tracks of 1435 mm and 25 kV AC through an overhead catenary. The trains consist of four carriages and can travel at a maximum speed of 80 km per hour.
The Jaipur Rail Project is being developed in stages, with the east-west and north-south corridors. The project’s initial phase is an east-west corridor from Mansarovar to Badi Chaupar. The second phase is a 23-km north-south corridor that extends from the Sitapura Industrial Area to Ambabari, comprising a combination of underground and elevated stations. The underground section is 5 km long, while the elevated section is 18 km long, including five underground stations and fifteen elevated stations.
The Jaipur Metro is a critical mode of transportation for the city, serving tens of thousands of commuters daily. It has established itself as an essential public transportation system in Jaipur and continues to expand and improve. Let’s dive into the specifics of the Jaipur Metro.
Jaipur Metro Rail – Route Map:
The Jaipur Metro is being developed through two phases, with the Pink Line included in Phase I and the Orange Line included in Phase II. The first phase is operational, while the second is still under construction. The responsibility for the project’s execution lies with the Jaipur Metro Rail Corporation Limited.
The Pink Line, known as Phase I, runs from Mansarovar to Badi Chaupar. The Orange Line, on the other hand, covers the Sitapura to Ambabari route.
Jaipur Metro Rail- Pink Line:
The Jaipur Metro Rail’s first route is the Pink Line, which links Mansarovar and Badi Chaupar. The route is around 12.067 km long and consists of 11 metro stations, of which 3 are underground, and 8 are elevated. The Pink line is divided into phases: Phase I-A and Phase I-B.
Phase I-A consists of nine stations from Mansarovar to Chandpole, covering a distance of 9.718 km. On the other hand, Phase I-B has only two stations, namely Choti Chaupar and Badi Chaupar, and is about 2.349 km long.
The Pink Line of Jaipur Metro has two major stations on this line: Railway Station Metro Station and Sindhi Camp Metro Station.
Railway Station Metro Station is a crucial station, as it is situated near Jaipur Junction, the city’s primary railway station. Jaipur Junction offers direct trains to other significant cities in India. Passengers can easily board Railway Station Metro Station to travel from Jaipur Junction to other parts of the city.
Sindhi Camp Metro Station is also an important station on the Pink Line. It is located close to Jaipur’s inter-state bus station, known as Sindhi Camp, which is situated on Station Road. Sindhi Camp is a popular spot for bus pick-up and drop-off. Passengers can take the metro from Sindhi Camp Metro Station to reach the bus stand without any hassle, making their travel experience more convenient.
Jaipur Metro Rail- Orange Line:
The proposed Orange Line of Jaipur Metro will have a total of 20 stations, and they are:
- Sitapura Industrial Area
- Pratap Nagar
- Haldi Ghati Gate
- Sanganer
- Laxmi Nagar
- Durgapura
- Mahavir Nagar
- Gopalpura
- Dev Nagar
- Tonk Phatak
- Gandhi Nagar Mode
- Sawai Mansingh Stadium
- Narayan Singh Circle
- Sawai Man Singh Hospital
- Ajmeri Gate
- Government Hostel
- Sindhi Camp
- Subhash Nagar
- Pani Pench
- Ambabari
These stations will be located along the 23-km long north-south corridor, with 15 elevated stations and 5 underground stations. The proposed Orange Line will provide convenient connectivity to various parts of Jaipur, including important landmarks such as Sawai Mansingh Stadium, Sawai Man Singh Hospital, and Ajmeri Gate.
Jaipur Metro Rail – Timings:
The Jaipur Metro is considered one of the quickest modes of transportation in Pink City. Taking the metro can save time and get you to your destination efficiently.
The metro operates from 6:20 AM to 9:49 PM, and the first train from both Mansarovar and Badi Chaupar stations begins at 6:20 AM. The last metro on the Mansarovar to Badi Chaupar route departs at 9:20 PM, while the last train on the Badi Chaupar to Mansarovar route leaves at 9:21 PM.
The metro journey lasts around 34 minutes from Mansarovar to Badi Chaupar and approximately 35 minutes from Badi Chaupar to Mansarovar.
There are 89 trains available on the Mansarovar to Badi Chaupar route, with a train departing every 18 minutes from 6:20 AM to 7 PM and every 10 minutes from 7 PM to 9:20 PM. On the other hand, there are also 89 trains on the Badi Chaupar to Mansarovar route, with a train departing every 25 minutes from 6:20 AM to 7 PM and every 10 minutes from 7 PM to 9:21 PM.
Depending on the station you board from, you can reach different destinations in varying durations. For instance, a metro from Mansarovar takes approximately 21 minutes to reach Railway Station Metro Station, 25 minutes to reach Sindhi Camp Metro Station, and 28 minutes to reach Chandpole Metro Station.
Similarly, a metro from Badi Chaupar takes about 9 minutes to reach Sindhi Camp Metro Station, 13 minutes to reach Railway Station Metro Station, and 35 minutes to reach Mansarovar.
Jaipur Metro Rail Fare 2023:
Jaipur Metro is an affordable transportation option in the city. Passengers can choose from various options like tokens, smart cards, and tourist cards to pay for their travel on the Jaipur Metro Route.
The minimum fare for the Pink Line on Jaipur Metro is INR 6, while the maximum fare is INR 22.
If you board the Pink Line metro from Mansarovar, you will be charged INR 18 to Railway Station, INR 18 to Sindhi Camp, and INR 18 to Chandpole. On the other hand, if you catch a metro from Badi Chaupar, it will cost you INR 12 to reach Railway Station, INR 12 to reach Sindhi Camp, and INR 22 to reach Mansarovar.
Smart Card:
Daily commuters can purchase a metro smart card or pass by depositing INR 50 at the time of acquisition. Upon returning the card in good condition before its expiration date, customers will receive a refund of INR 50. The smart card provides a 15% discount per station fare compared to the token. The card can be recharged through applications or over the counter.
By using a smart card, there is no need to queue up for tokens, saving both time and money. It is user-friendly, and one can easily buy or reload a smart card and gift it to friends or family. Moreover, using a smart card is more cost-effective, and passengers receive a discount on every journey, as follows:
- No discount for fares less than INR 10.
- A 10% discount for tickets between INR 10 and less than INR 20.
- A 15% discount for fares of INR 20 or more.
It is possible to alter or extend your travel, and the fare will be calculated according to your journey on the Jaipur metro route.
Tourist Card:
The Rajasthan government funds the metro and provides a special tourist metro card for visitors. There are two tourist cards available on the Jaipur Metro: a one-day card and a three-day card, which can be used during the validity period. A one-day card costs INR 100, and a three-day card costs INR 200, both of which include a refundable security deposit of INR 50.
How To Check Balance On Jaipur Metro Card?
Passengers of Jaipur Metro can check the balance of their metro card by using the add-value machines, customer care centres, and automatic token vending machines available in the stations. The exit gate will also display the remaining balance when the passenger leaves the platform.
How To Recharge Jaipur Metro Card?
- To recharge your metro card, you can either log in to your account and select the “Recharge your card” option or use the “Quick top-up” button on the website’s homepage.
- Enter the Engraved ID, which is written on the back of the card, and the desired recharge amount.
- If using the Quick top-up option, enter a valid email ID, then click “Submit” to see payment options.
- Choose a suitable payment option and confirm the payment details.
- Once the recharge is successful, show the card on an Add-Value Machine (AVM) at any metro station within 90 days to complete the recharge.
Jaipur Metro Phases:
The Jaipur Metro system is divided into two phases. Phase-I includes the Pink line, which is further divided into three parts. Two of these parts are currently operational, while the third is still under consideration. Phase II includes the Orange line, which is currently under construction.
Jaipur Metro Phase 1A:
The first operational phase of the Jaipur Metro network is known as Phase-IA, and it connects Mansarovar to Chandpole, covering a distance of 9.63 km. This Jaipur Metro route was constructed in 2014 but began operating for the public in June 2015. The following stations are a part of this Jaipur Metro route:
- Mansarovar
- New Aatish Market
- Vivek Vihar
- Shyam Nagar
- Ram Nagar
- Civil Line
- Railway Station
- Sindhi Camp
- Chandpole
Jaipur Metro Phase 1B:
The Pink Line of Jaipur Metro’s Phase-IA has been extended with a 2.3 km stretch connecting Chandpole and Badi Chaupar. This extension completes the Pink Line from Mansarovar Metro station to Badi Chaupar, passing through Civil Lines and Chandpole. It was opened for public use in September 2020.
Jaipur Metro Phase 1C:
Jaipur Metro Phase 1C is currently in the planning phase and involves extending the Pink Line from Badi Chaupar to Transport Nagar. The proposed Jaipur Metro route will be 2.85 km long, and if it receives approval, it is expected to be completed by March 2025. This route will have three stations along the way.
Jaipur Metro Phase 2:
The construction of Phase 2 of the Jaipur Metro is currently in progress. It is expected to link the Sitapura Industrial Area to Ambabari via the MI Road and Ajmeri Gate. This stretch, known as the Orange Line, will have 20 stations and cover 23 km. The completion of this Jaipur Metro route was originally scheduled for 2021; however, due to public opposition, it is currently under revision.
The stations on this Jaipur Metro route include Ambabadi, Tonk Pathak, Pani Pech, Dev Nagar, Subhash Nagar, Gopalpura, Sindhi Camp, Mahaveer Nagar, Govt Hospital, Durgapura, Ajmeri Gate, Jaipur Airport Station, SMS Hospital, Sanganer, Narayan Singh Circle, Haldi Ghati Gate, S Mansingh Stadium, Pratap Nagar, Gandhi Nagar Mode, and Sitapura Industrial Area.
Jaipur Metro Passenger Facilities:
Jaipur Metro offers a range of facilities for the convenience and comfort of its passengers. The elevated or underground stations are equipped with ramps and escalators for easy access. Passengers can also avail of shopping and entertainment spaces in these stations. In addition, feeder bus services are available to help passengers reach the stations, and car parking facilities are available at each station.
Automatic station announcements in Hindi and English provide helpful information to passengers. ATMs, cell phone recharge booths, and parking facilities are available at several stations. Eating, smoking, and drinking are prohibited throughout the system to maintain a safe and clean environment. The metro also features a state-of-the-art fire alarm system that provides early warning in an emergency. In addition, the trains and stations are built with fire-resistant materials to ensure passenger safety.
Jaipur Metro: Latest Updates
The Delhi Metro Rail Corporation (DMRC) has been chosen to be the general consultant for the Jaipur Metro Line 1C and 1D extension. An MoU was signed between the Jaipur Metro Rail Corporation (JMRC) and DMRC. This is not the first time DMRC has been appointed as the consultant for constructing the Jaipur Metro line.
The first phase of Jaipur Metro, constructed between Mansarovar and Badi Chaupar, took four years. The extension of phase 1, which was 2.4 km long, took over four years and was done by a construction contractor based in Taiwan.
The expansion of phases 1C (Badi Chaupar to Transport Nagar) and 1D (Mansarovar to Ajmer Road) was announced in the 2022-23 budget. A Detailed Project Report (DPR) for Phase 1C has already been prepared and submitted by DMRC, with a length of 2.85 km and an estimated cost of Rs. 993.51 crores.
There are a total of 11 metro stations in Jaipur.
No, Jaipur Metro is not completely underground. It has a mix of both elevated and underground tracks. The first phase of the Jaipur Metro opened in 2015, has an underground section of about 2.4 kilometres, while the remaining section is elevated.
A: The Jaipur Metro Rail, also known as JMRC, has one operational line: Line 1 (Pink Line). The Pink Line runs from Mansarovar in the west to Chandpole in the east, covering a distance of approximately 12.07 kilometres. The line has 11 stations, including Mansarovar, Civil Lines, Ram Nagar, and Chandpole. The JMRC is also planning to add two more lines to its network.
Jaipur Metro Customer Care (Helpline) Number:
If you have any queries or need further information about the Jaipur metro, you can reach out to the following address, phone number, or email:
- Office Address: Admin Building, Metro Depot, Bhrigu Path, Mansarovar, Jaipur-302020
- Email: cmd@jaipurmetrorail.in
- Contact No. : 0141-2822756